亚洲精品自拍,国产老熟女高潮精品,97在线国产超碰,wwwav网站亚洲

vip@bjstb.com 400-060-0068

Heavy-duty shelves installation methods and steps

Source:z7208.cn Author:思特博貨架拆裝 Date:2024-01-31 Views:

How to install heavy-duty shelves?The installation process of heavy-duty shelves. There will always be more or less problems during the installation process of heavy-duty shelves. Either the part is missing or the tool does not know where to put it. Therefore, the installation employees must pay attention to the installation process of heavy-duty shelves. , so that the installation of heavy-duty shelves can be completed in an orderly manner without any problems of this kind.The following is a detailed introduction to the installation process of heavy-duty shelves.

 33263876d18b5b9bc5c0cf3e7f6d069e_1655560879468679.jpg

1. Assembly of column pieces.

1. Take out the two columns and arrange them in the same order.

2. Take out the horizontal diagonal brace (the long one is the diagonal brace, the short one is the horizontal brace), and align a horizontal brace with the screw hole closest to the foot of the column (the opening faces upward). 

3. Place the washer (block) on it.

4. Tighten the nut before inserting the screw (no need to tighten).

5. Put the other end of the cross brace into the same position of the other column, align a diagonal brace with the hole and put it into this column (with the opening facing downwards), insert the spiral thread and screw it on (no need to tighten it) ).

6. Align the other end of the diagonal brace with the higher hole of the other column, take out another diagonal brace, insert the screw, and tighten the nut.Install all diagonal braces accordingly.

7. When it is installed at the top hole, take a horizontal brace and install it on the column together with the end of the last installed diagonal brace.

8. Place a washer (block) on the other end of the cross brace and install it into the column.

9. Install all the column pieces in this way and tighten all the screws with a wrench.

    

2. Installation of cross beams

1. Stand up a column piece (with the feet facing down) and snap one end of the beam into the appropriate position of the column piece.(The bayonet of the cross beam faces downward, which means the safety pin hole faces downward) 

2. Insert the safety pin.

3. Accordingly, set up another column piece to install the other end of the beam, and then install all the beams according to the actual cargo placement requirements.

 

3. Installation of partitions.

1. Insert the partitions into the appropriate position of each crossbeam (a position that can support the pallet). To maintain a beautiful appearance, each partition should be placed in the same direction.

2. Installation of sub-frame.One end of the sub-frame cross beam is installed on the column piece of the adjacent shelf.

3. Fixation of position.Arrange the shelves neatly according to the drawings or actual placement requirements.

4. Fix the bottom corner.

5. Use an impact drill (the drill bit is selected according to the expansion bolt provided) to drill holes at the fixing point of the shelf foot.

6. Insert the expansion bolt into the drilled hole, smash it down with a hammer, and tighten it with a wrench.


TAG:
Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
CONTACT
In the future, the company will continue to adhere to the concept of professional development, continue to broaden its business ideas and business scope, make continuous improvements in product research and development, market development, and improve service levels, and strive to become a shelf supplier trusted by customers.
+86(10)-57794990 / 57794760 138 0102 0776(Click) / 1370 126 4023(Click) vip@bjstb.com Company: 14-2-83-84, No. 50, Huayuan Chunhe Road, Daxing District
Scan and consult immediately
Exclusive customization welcome consultation STABLE Shelves provides high-end exclusive customized services for every distinguished guest.Fill out the form below and our dedicated service consultant will contact you.
Phone:*
Email:*
Message:*

Copyright ? 2002-2024 北京思特博貨架制造有限公司 版權(quán)所有 ICP:京ICP備16033024號

Some of the manuscripts on this website (not limited to text and pictures) are reprinted on the Internet in order to spread more information. This website does not assume joint and several liability for the infringement of such manuscripts.
If you find that any content infringes your copyright, please send the relevant content to this email [vip@bjstb.com]. After confirmation, we will delete it immediately to ensure your copyright.
LEIZHOU
Email:

TEL

WECHAT

截屏,微信識別二維碼
微信號:138 0102 0776
(點擊微信號復(fù)制,添加好友)
打開微信
久久久久久久综合日本亚洲| 91综合国产精品视频| 乆乆久久久久久久| 亚洲国产成人精品无码区宅男?| 国产精品无码在线播放| 新中文字幕最新| 国产A性大全| 亚洲性爱区中文字幕| 成人午夜精品一级| 日本A网址| 久久综合2024| 丰满熟女高潮视频国产| 国产午夜福利美女爆乳视频| av 天堂一区| 亚洲视频一二三区| 亞洲歐美日韓精品專區| 91精品国产综合久久久亚洲日韩| 国产精品久久久久久久四库| 国产精品18久久久久| 欧美日韩国产在线看| 91精品超碰| 无码久久久电影| 日韩精品毛片| 亚洲乱码av一区二区三区| 最新综合AV| 久久精品成人无码AV片观看| 日本人妻中文字幕第一区| 久久午夜夜夜操| 东北女人精品在线| 亚洲春色AV无码专区在线播放| 中文字幕无码手机| 日本在线加勒比| 日韩精品一区二区三区毛片| 四川少妇毛片| 亚洲无码在线观看黄| 中文字幕国产视频| 农村少妇bbw| 在线一级成人毛片免费看| 99精品全部免费20| 久久线上AV电影| 国产精品成人一二三区|